Concrete / CAD

Concrete Volume Calculator

Estimate slab volume, editable ready-mix cost and an overage allowance.

Content reviewed · Editable example — not a market quote
Editable example — not a market quote

Your inputs

Units
Min 0.01
Min 0.01
Min 1
Pricing, waste & allowances

Price starts at zero: enter your supplier quote. No currency conversion.

Editable example — not a market quote
Editable example — not a market quote
Editable example — not a market quote
Editable example — not a market quote
Editable example — not a market quote
GST / HST / PST — enter the applicable combined rate

Currency changes the display, not the exchange rate. Enter all money values in the selected currency.

Your estimate

LIVE CALCULATION
Order quantity (m³)
2.64
Materials
$0.00
Labour
$0.00
Equipment
$0.00
Contingency allowance
$0.00
Subtotal before tax
$0.00
Tax on subtotal
$0.00
Total including tax
$0.00
Assumptions used
  • Tool: Concrete Volume Calculator
  • Currency: CAD
  • Units: metric
  • Length: 6 m
  • Width: 4 m
  • Thickness: 100 mm
  • Waste / overage (%): 10%
  • Tax rate (%): 0%
  • Contingency (%): 0%
  • Material price per unit: $0.00 / m³

Tax applies to the entire subtotal including contingency. Adjust the rate or budget for your applicable treatment.

Planning estimate only. Not a substitute for a professional quote or local building-code compliance. Verify quantities, tax treatment and contract requirements.

Shared links include your inputs in the address. Do not share confidential information.

Saved on this device

Enable optional storage in Privacy choices to save estimates.

The maths, explained

Measure a rectangular slab in one consistent unit system. Thickness is easy to misread: a drawing may show millimetres or inches while length and width use metres or feet. The calculator converts dimensions to metres before finding net cubic volume, adds your overage, and prices the order volume in the displayed cubic unit. Separate irregular sections before adding their volumes.

Net volume = length × width × thickness; order volume = net volume × (1 + overage / 100)

A worked example

The worked example below uses the calculator’s initial inputs and the same calculation function as the live interface. Replace example amounts with your own records; changing currency does not convert the numbers. Physical reference dimensions are stored in metric units, and the interface can display their imperial equivalents. Rounded display values may differ slightly from the full precision retained in the calculation.

A worked example
Your inputsEditable example — not a market quote
Length6 m
Width4 m
Thickness100 mm
Order quantity with 10% example waste2.64 m³

Assumptions used

The result assumes simple geometry and the dimensions actually entered. Waste, unit price and allowances are editable assumptions, not verified regional market rates. An allowance is not a guarantee: compare the answer with the chosen product, cutting or laying plan, and delivery constraints. Tax is applied to the complete subtotal including contingency in this model; adjust the budget if your applicable tax base differs.

On your side of the Atlantic

Canadian projects often mix metric drawings with imperial products. Confirm the supplier’s units and the applicable GST, HST or PST treatment for your province.

Common mistakes

Do not enter an inch thickness as feet. Check the formwork, base preparation, delivery minimum, pump cost and packaging with the supplier. The model estimates volume; it does not select concrete strength or reinforcement.

Before ordering or tendering, compare at least two scenarios: your base takeoff and a realistic alternative. Keep assumptions with the result so differences are explainable. Save an estimate only on a suitable device. A shared link contains the entered values, so avoid including confidential information. An exported estimate is a snapshot and does not update when a supplier changes a price.

Questions from the jobsite

What does this calculator measure?
Measure a rectangular slab in one consistent unit system. Thickness is easy to misread: a drawing may show millimetres or inches while length and width use metres or feet. The calculator converts dimensions to metres before finding net cubic volume, adds your overage, and prices the order volume in the displayed cubic unit. Separate irregular sections before adding their volumes.
What is the first mistake to avoid?
Do not enter an inch thickness as feet. Check the formwork, base preparation, delivery minimum, pump cost and packaging with the supplier. The model estimates volume; it does not select concrete strength or reinforcement.
Are the example prices supplier quotes?
No. Monetary defaults are editable scenarios. Obtain a dated quote that states currency, tax treatment, units, delivery and exclusions. None of the example amounts is presented as a local average.
Which tax assumptions apply in Canada?
Canadian projects often mix metric drawings with imperial products. Confirm the supplier’s units and the applicable GST, HST or PST treatment for your province. The optional tax field starts at 0% so no jurisdictional rate is silently assumed.
How should I handle waste and contingency?
Waste increases quantity before purchase rounding. Contingency is a separate monetary allowance. Adjust each for the product, layout and your records; they are different assumptions and should not be confused.
Can I use the result in a tender or estimate?
Use it as a checked planning starting point. Attach the assumptions, confirm the scope and verify local requirements. A calculation does not replace a professional quote or a building-code compliance assessment.

Planning estimate only. Not a substitute for a professional quote or local building-code compliance. Verify quantities, tax treatment and contract requirements.

See our methodology →

Your next calculation

All tools ↗